We have a new documentation site. Please go here to see the latest.

Reopen issue when checklist becomes uncompleted

This guide is based on Jira built-in automation functionality.

In this guide, we will transition the issue back to In Progress status when any checklist item becomes uncompleted

You can also close the issue in a similar way if the checklist becomes completed.

Prerequisites

"Save checklist data to Jira custom fields" option must be enabled in Issue Checklist Global Settings

Guide

  1. Go to Automation listing page (it is either Project settings > Project automation or Jira Settings > System > Automation rules) and press Create rule button:



  2. On the New trigger page select Field value changed option:



  3. On the Field value changed page select Checklist Completed (Field) in the first list and next select Edit issue in the second list, and press Save button:



  4. On the Add condition page select New condition option:



  5. On the New condition page select Issue fields condition option:



  6. On the Issue fields condition page paste select "Checklist Completed" from the list of fields, "equals" in the condition dropdown, and "Not Completed" in the value dropdown. Next, press Save button:



    Hint: Please note that adding a new item to the already completed checklist, will make the checklist uncompleted. 

  7. On the New component page select New action option:



  8. On the New action page select Transition issue option:



  9. On the Transition issue page select desired transition status, e.g. In Progress or any other status that you want, and press Save button:



  10. On the next page, add a name/description to the automation rule and press Turn it on button:



  11. Test your setup and enjoy: 
    1. go to any issue page,
    2. add a checklist,
    3. complete the checklist (check all items)
    4. transition the issue to some other status than selected in this tutorial
    5. uncomplete checklist (open one item) and wait a moment (Automation needs time to process the data)
    6. Next, refresh the page and notice that issue is in the desired status (e.g. In Progress).

Please note that the transition to In progress (or another status) must be possible according to the workflow defined in the current project. Otherwise, the transition attempt will fail.